HYDROTEST PROCEDURE OF HEAT EXCHANGER AT SITE. Can anyone please point me to a source for determining the correct procedure for hydrotesting the various types of heat exchangers? Thanks. ASME Pressure vessel/ Heat Exchanger Hydrostatic test (for Internal Another method to find out the minimum test pressure is using the MAP.

Author: Tugami Dudal
Country: Bolivia
Language: English (Spanish)
Genre: Personal Growth
Published (Last): 15 December 2004
Pages: 454
PDF File Size: 7.67 Mb
ePub File Size: 9.72 Mb
ISBN: 406-4-75704-810-5
Downloads: 23177
Price: Free* [*Free Regsitration Required]
Uploader: Meztira

If no leakages observed test to be considered satisfactory. Also Check whether water coming out of bottom nozzle of shell. API also accepts this practice. I do not need to research the test pressures, just the methodology.

Heat Exchanger Hydrotesting Procedures – Chemical plant design & operations – Eng-Tips

It demonstrates that relying on gage indication of pressure loss to assess leaks weeping that would not be visible during hydrostatic testing does not indicate whether there are such small leaks. Check for leakage of all girth jointwhich are under pressure.

This is done after pulling and cleaning. This includes the possibility of wiredrawing wormholing in high pressure closed feedwater heaters in which a leak of high pressure feedwater through the tube-to-tubesheet welds can erode the steel under the weld overlay to which the tubes are welded.

Art Montemayor Spring, TX. As far as I know that the hydrotest by air is safety concern and water is usually used.

Page 3 of 3. It is necessary to understand the service of the exchanger and the degree of hazard such leakage presents. The air test is not a hydrotest, with the hydrotest you evaluate the structural integrity, with the air test you localize problems.

  8KCAB POH PDF

HYDROTEST PROCEDURE

In addition check nozzle flange joints between top and bottom heat exchanger for leakages. Thank you for interesting in our services. There are special air tools for tube bundle testing. Heat Exchanger Hydrotesting Procedures The air test is not a hydrotest, with the hydrotest you evaluate the structural integrity, with the air test you localize problems.

Except for leakage that might occur at temporary test closures for those openings intended for welded connections, leakage is not allowed at the time of the required visual procevure. The minimum hydrostatic test pressure at room temperature shall be 1. The Eng-Tips staff will check this out and take appropriate action.

HYDROTEST PROCEDURE – PDF Free Download

For flanged joints at inlet and outlet should be tested with service gaskets. Typically, the Manufacturer pressurizes the shell with air or nitrogen at 30 to 50 psi and applies a commercial bubble former to the tube-to-tubesheet joints. Sometimes you test the bundle, the the shell side, sometimes the tube side together with the shell side, etc.

Tube-to-tubesheet joints of some types of shell-and-tube heat exchangers, such as fixed tubesheet designs and closed feedwater heaters in which the channel is welded to the shell, are visible only from the channel side with the shell side under pressure and the channel side at atmospheric pressure. Hydrotest Dan Pneumatic Test. Therefore, recently we have done both air and water hydrotesting for some equipement in the plant where the fluid service either vapour or liquid.

When the tube side design pressure is the higher pressure, the tube bundles shall be tested outside of the shell only if specified by the purchaser and the construction permits.

What constitutes a suitable leak test if the standard Code hydrostatic test cannot disclose very small leaks weeping? I’ll be searching the TEMA standards. Heat Exchanger Hydrotesting Procedures As far as I know that the hydrotest by air is safety concern and water is usually used.

  FORMULIERUNGSHILFEN BEWERBUNG PDF

Join your peers on the Internet’s largest technical engineering professional community. I don’t have a source, but I’ve done it many times on differet HeatX’s. Users must recognize the hazards of process fluids leaking from the channel into the shell and where hazards exist, specify further leak testing as described in Section V of the Code.

If there is pressure drop ,then investigate for the reason ason else reduce the pressure to corresponding design pressure for tube side and check for leakage. Defense manufacturing is all about project haet and project accounting. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

ON HYDROSTATIC TESTING HEAT EXCHANGERS.pdf

This means that pricedure AI must reject any visible leakage of exposed tube-totubesheet joints such as weeping around the tube-to-tubesheet connections during testing. I have seen incidents with air hydrotesting that caused fracture of some vessels. Typical procurement specifications for high-pressure feedwater heaters require 10 cycles of bringing the channel to the hydrostatic test pressure followed by dropping the pressure to atmospheric for each cycle.

Seams then bring it to the notice of PMC before proceeding with further action. Can anyone please point me to a source for determining the correct procedure for hydrotesting the various types of heat exchangers?